If I was going the route of plugging holes on the bottom of the tank with bulkheads. I for sure would use schedule 80 pvc bulkheads over the abs schedule 40’s. The face is much thicker/stronger less likely to flex and allow water to seep past a gasket.
Sent from my iPhone using Tapatalk Pro
Sent from my iPhone using Tapatalk Pro
Last edited: